Project: BuckRV-8   -  
            Listing of Entries
    (Please mouse-over any icon to get a description of that function).



Categories
  
Builder Name:Buck Wyndham   -  
Project:   Vans - RV-8   -   VIEW REPORTS
Total Hours:3948.15
Start/Last Date:Jan 08, 2002 - No Finish Date
Engine:AeroSport Power IO-375-M1S
Propeller:Whirlwind 330-3B/72H-73 3-blade CS
Panel:G3X, G5, GTN650, GTR20, GTX45R, GMA245, GMC507
 
Friendly URL: https://eaabuilderslog.org?s=BuckRV-8

Home or Last Project Picture

Jun 04, 2008     Elevator horn drilling - (1.0 hour)       Category: Controls
I received the $11 drill bushing I ordered from McMaster-Carr (A 1/4" OD, #40 ID steel bushing), so with the limited time I had today, I drilled the main attach bolt holes in the elevator horns.

First, since the bushing wouldn't quite fit inside the horizontal stabilizer bearing, I chucked the bushing in the drill press and turned it down (with 100-grit sandpaper) until it would fit. I inserted the bushing in the bearing, and slid a 6" #40 drill bit through the bushing to check the position of the hole on the horn (remember that an AN4 bolt head has to fit alongside the bead of the horn weld), then I drilled the holes.

I drilled the left horn first, then removed the left elevator, installed the right one, and drilled the right horn. I'll enlarge these holes to slightly less than 1/4", then ream them for a perfect fit.

I noticed that the plans call for an AN4-15A bolt in this application, but after measuring a bit, I think I'll need at least an -18A.


 


NOTE: This information is strictly used for the EAA Builders Log project within the EAA organization.     -     Policy     -     © Copyright 2024 Brevard Web Pro, Inc.